The Tiny - Electricity Meter      
HCM4 - Heat Meters
 
   
 
 
 
About
Electricity Meters
Gas Meters  
Heat Meters  
Oil Meters  
Water Meters
APM - Automated Prepayment Metering
Card PrePaymenmt Meters
M Bus  
Modbus    
Energy Centre    
meters uk Ltd
  ISO 9000 Accredited Manufacturer    
 

Energy Centre

 
 
Display's your buildings Carbon Footprint
                       
                   
       
F A Q's
     
                   
       

Q1 – How many Utilities can the Energy Centre show ?
A1 - 4 – Electricity – Gas – Heat & Water

Q2 – How does it work. ?

A2 – A Secondary /Sub Meter is installed on each utility after the main sub meter.
These meters have mbus protocol which communicate with a mbus master (data collector) This data is configure by the Energy Centre software to give you the on screen information.

Q3 - What is Mbus protocol ?
A3 – M Bus is a language specifically designed for the reading of utility meters, it
provides highly accurate data, and is the preferred communication language,
of the new generation of ‘Smart Meter’s’ . http://www.m-bus.com

Q4 – What is included in the Energy Centre Package ?
A4 – Utility Meters mbus enabled + M Bus Master (Data Collector) + Netbook/Laptop
Computer + TV Screen is required but not supplied by us.

Q5 – Does the Energy Centre require specialist installers ?

A5 - The Utility meters can be installed by your local contractors, and the rest is basically a
plug and play installation, we despatch the Netbook Computer with all the software
configured and ready to go.

Q6 - Can I use my own computer instead of the Netbook Laptop ?

A6 - No the software is despatched fully configured, and putting onto another PC
could damage its operational integrity.

Q7 - How much does the software cost ?

A7 - The Software is FREE OF CHARGE .. it costs nothing and is configured onto a Netbook
Laptop Computer for which there is a small set up charge. There should never be a reason to change the settings in future.

Q8 - How much does the Energy Centre Package Cost ?
A8 - Some examples (All include Netbook – Laptop Computer –)
Small Building
Single Phase Electric – Small Water – Small Gas Meter £900.00
Medium Building
Three Phase Electric – Small Commercial Gas Meter – Heat Meter – Small Commercial Water £ 1600
Large Building
Three Phase Electric – Commercial Gas Meter – Heat Meter – Commercial Water Meter £ 2900
(Prices exclude vat & carriage All costs are estimated and don’t include any installation costs)

Q9 – Why cant I use the Primary Utility Meters that are already there ?

A 9 - Utility Companies will not allow access to their meters and primary utility meters do not have the communication protocols to communicate with the Energy Centre Software

Q10 – What do I need to receive an accurate quotation?
A 10 – The following information – mostly gathered from your current utility meters
Electricity – Single Or Three Phase and amperage ( Three Phase)
Gas – Pipe Size + ‘U’ rating or Max Flow Rate
Heat - Hot Or Chilled & Pipe Size
Water – Pipe size
Note** Without the above information we cannot give an accurate quotation.

Q11- What guarantee is on the products?
A11 – All products we manufacture have a warranty against mechanical failure or similar for
a period of 12 months . The Netbook Computer has a similar warranty with the manufacturer

Q12 – What if I wish to display other Energy information on screen?
A 12 – We will gladly evaluate this but the software changes are likely to be chargeable

Q13 – How do I get an accurate quotation?

A13 - Please forward information as listed in A10 to sales@meters .co.uk
You will receive a quotation by return.

Q14 – What If I don’t have gas or heat metering in my building. The Energy Centre

Software will be preset to display only the meters and utilities connected.