%@LANGUAGE="JAVASCRIPT" CODEPAGE="1252"%>
| meters uk Ltd™ | ![]() |
||||||||||||||||||||
![]() |
|||||||||||||||||||||
| Utility Meter Manufacturers | |||||||||||||||||||||
Current
Transformers |
|||||||||||||||||||||
| Standard Ring Transformers | |||||||||||||||||||||
| Ease Of Installation - Split Core Transformers | |||||||||||||||||||||
Current transformers are required for 3 Phase Meters when a installation's current is 100amps plus. A standard transformer is round in shape and the wiring goes through the centre, two wires from the lugs of the transformer wire into the meter. Should installation be a problem due to location, or inability to switch off, Split Core Transformers offer an ease of installation |
|||||||||||||||||||||
| Standard Transformers | Wiring Diagram | Split Core CT's | |||||||||||||||||||
| Back - Electricity Meters |
|
||||||||||||||||||||